Our cooperation with Stora Enso also continues after the Veitsiluoto project. The customer is satisfied with the project. ”The preliminary preparations were very significant for this project. Everything was thought through and under control. VEO kept to the timetable and was even ahead of schedule”, tells MIKA PESONEN, project engineer at Stora Enso.
