Skip to content
  • Power Generation
    • Construction of the largest substation in Finland’s grid begins Hydropower
    • Construction of the largest substation in Finland’s grid begins Thermal Power
    • Construction of the largest substation in Finland’s grid begins Engine & Hybrid power
  • Power distribution.
    Power Distribution
    • Construction of the largest substation in Finland’s grid begins Windpower
  • Power utilisation.
    Power Utilisation
    • Construction of the largest substation in Finland’s grid begins Industry
    • Construction of the largest substation in Finland’s grid begins Marine
  • Company
  • Careers
  • News
  • Contact
  • Solutions
  • Expert services
  • References

Home » Archives for Anu Valkama

Construction of the largest substation in Finland’s grid begins

Pysäysperä substation site

Coronavirus pandemic shifted FAT tests to remote services

According to VEO, the rearrangements for remote testing took a little while to implement successfully, but now, after half a year, the new arrangement is starting to pan out and has become an even better option than the old method. “The strength of remote testing is its ease. FAT test sessions often involve both VEO’s...
Veo safety testing.

Project management is teamwork

The right devices create a functional whole Once all the plans are clear, the project can be taken forward. The next significant step is the procurement of the necessary equipment and parts, which can come either from VEO’s factory or from external suppliers. “The functionality of individual devices is key to the success of the...

Fingrid has chosen VEO to build the largest substation in Finland’s grid so far

Signing of the agreement on Monday 19.10.2020 at Fingrid’s premises. From left to right: Fredrik Grankull, Vice President and Director of VEO’s substation unit, Timo Ala-Heikkilä, CEO of VEO, Jukka Ruusunen, CEO of Fingrid, and Timo Kiiveri, Senior Vice President and Asset Management of Fingrid.
VEO Fingrid Pysäysperä Substation

VEO signs two new contracts for hydropower plant modernisations in Sweden.

To VEO’s customers and cooperation partners on May 4th, 2020

To VEO’s customers and cooperation partners / VEOn asiakkaille ja yhteistyökumppaneille

     

VEO’s and Arcteq’s innovation as part of VAMK’s electrical engineering programme

“The Generator Commander consists of equipment and software functions that will provide the optimal solution for every need. This has been almost impossible to achieve until now,” explains VEO’s Sales Manager Hannu Erkkilä. This remarkable product can now also be found at the Technobothnia Research Centre as part of the electrical engineering programme provided by...

Meet Tom Karppinen, VEO’s Director of Strategic Sourcing and Project Purchasing

The number of VEO industrial sectional drive and automation deliveries rose by a third from the previous year

VEO drives applications
Page 1 of 212»
Careers

Careers

Contacts
Runsorintie 5
FI-65380 Vaasa
Finland
Tel: +358 207 1901 Fax: +358 207 190 501 veo@veo.fi

  • Company
  • Careers
  • News
  • References
  • Privacy Statement
  • Cookie Policy
  • Power Generation
  • Power Distribution
  • Power Utilisation
  • Business segments

    • Hydropower
    • Wind power
    • Industry
    • Thermal power
    • Marine
    • Engine & hybrid power
  • Solutions
    • Automation and protection systems
    • Bus duct systems
    • Drives applications
    • Excitation
    • Low-voltage switchgear
    • Medium-voltage switchgear
    • Substations
    • Switchyards
    • Turbine governor
  • Expert services
    • Remote access and advisory services
    • Process tuning services
    • Modernisation and expansion projects
    • Spare part services
    • Testing services for all fail-safe systems
    • Pre-studies and consultation services

Newsletter